Client: Land and Marine - Pipeline installation analysis

Front end study on installation methodology for rigid pipelines in shallow water including:

  • Bottom pulled bundles
  • Float-flood
  • Above water tie-ins

Operations simulated using the latest version of OrcaFlex and recommendations provided for equipment rating and sizing.