Client: DONG Energy - Project: Walney Extension

A multi-phase project to assess the power cables at the Walney Extension windfarm. This included a review of the mechanical properties, calculating cable bending stiffness and then a number of analyses throughout the life of the cable including:

  1. Installation/pull-in
  2. Operation fatigue loading
  3. Extreme storm event loading