Client: Tekmar - Hohe See

Client: Tekmar - Hohe See

Global and local analysis of two cable & CPS combinations installed in monopile holes. 

An analysis of the free-hanging cable within the monopile was also conducted which calculated the fatigue life of the cable within the monopile when subjected to the full IEC load-case matrix for the WTG tower.

Client: Tekmar - Rampion

Client: Tekmar - Rampion

Cable protection system design and engineering for offshore wind farm. Cable and protection system storm and fatigue analysis, component load calculation and interface load calculation. Thermal analysis of power cable within protection system.